The hall working bee for Term 2 will include some or all of the following tasks pending the mix of people that come along:
- Straining the fence post of the back gate so the gate shuts properly.
- Adjust the freezer door in Kitchen 1 so that it swings shut.
- Organising and labelling stogare shelves in the garage.
- Hanging an honour board in the Main Hall.
- Strengthening the base of the attic ladder.
- Cleaning in the mezzanine space above Kitchen 1.
- Installing a new downpipe on the gutter in the NW corner of the main hall.
- Install door stops on two external doors.
- Clean gutters on low awning roofs.